      2. Commercial Projects

        With extensive experience in commercial applications using both mobile and high rise pumping methods, the Meales Group has the expertise to service the broad spectrum of commercial projects that arise.?? Below is a selection of commercial projects in which we have been involved.

        Peppers Pier Resort

        Hervey Bay’s largest project to date is the construction of the Peppers Resort. Covering the entire 10,000 Square Metres site with
        8 floors of apartments, approx 20,000 Cubic Metres was pumped over the 15 month duration

         

        Peppers Pier Resort – Hervey Bay
        Contractor: Pluim

        Duration: Sept 2005 – Dec 2006

         
         
        Harbour City, Port Moresby

        Building contractor Curtain Bros PNG are responsible for building stage 1 “The Edge Apartments” which is just part of the master plan for Harbour City, Port Moresby’s latest and greatest development.

        With the arrival of our first boom in Port Moresby in September 2010 Curtain Bros, for the first time has had access to the hire of a local boom to service the concrete placement on this 6 story project. Previously all concrete would have be placed with kibble or line pump.

        The Edge is now complete and awaiting the start of the next complex

         

         

        Harbour City, Port Moresby, PNG
        Contractor: Curtain Bros PNG

        Duration: 2010 – Current

         
         
         
        © 2018 Meales Concrete Pumping All Rights Reserved. Site Map
        色噜噜综合色在线视频
        <code id="h7fzj"></code>
        <th id="h7fzj"><sup id="h7fzj"></sup></th>
        <th id="h7fzj"><sup id="h7fzj"></sup></th>
            <u id="h7fzj"></u>

          1. <th id="h7fzj"><sup id="h7fzj"></sup></th>